Remove Construction Remove Drawings Remove Materials Remove Overhead
article thumbnail

What’s in a JOC Coefficient

Job Order Contracting

Here’s a listing of what is typically included in a construction contractor’s Job Order Contract coefficient… Contractor’s overhead and profit. Subcontractors’ overhead and profit. All waste and excess material. Sales tax on material and equipment costs. As built drawings. Quality control.

Overhead 100
article thumbnail

Hard Construction Costs

Job Order Contracting

Hard Construction Costs are the detailed tasks, materials, equipment, and labor required to complete a renovation, repair, maintenance, sustainability or new construction project. Hard Construction Cost – Issues with Traditional Methods. Detailed Line Item Construction Estimates – Apples to Apples.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

If it is required to develop a new building or refurbish surviving property, the owner should have arranged a document so that the work & other portions of the construction project can be performed systematically. Each construction project should comprise of crucial documents that generally form the part of every construction contract.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. Army Job Order Contracts fail to meet critical AFARS requirements most of the time. 5117.9001 Definitions.

Contract 226
article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Listed for fire-rated construction. Performance. N) maximum.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

b) “Indefinite quantity” means one or more of the construction tasks listed in the unit price book. (c) The pricing of each task shall be accomplished by multiplying the construction task unit price by the proposed quantity. Typically within a range of 0.80

article thumbnail

Job Order Contract Unit Price Book Basics

Job Order Contracting

Detailed Line Item Unit Cost Construction Estimating, & Unit Price Books, UPB (Unit Price Guides-UPG). A detailed unit cost line item construction cost estimate involves a review and understanding of the scope of work of the associated project including all possible factors and risks. Estimate preparation.

Contract 100