article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper personal protective equipment (PPE). Consult the MSDS for hazardous ingredients and proper PPE. Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper personal protective equipment (PPE). Standard Tools-Basic 2.

article thumbnail

Ignoring water issues can harm the economy - Contractor Magazine

Contractor Magazine

In Chicago, water rates are expected to double over the next five years; in many locales water and sewer rates collide with energy conservation, such as with water-cooled ice machines or air conditioning. A cooling tower might save 3 cents to 5 cents per ton-hour over an air-cooled system, but the water and sewer costs may be 6 cents.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Engineers and consultants could also be needed for such things as steep slope foundations, downside soils (expansive clay, loose fill, peat), advanced drain problems, uncommon structural style, septic systems in environmentally sensitive areas, and so on. ON-SITE WATER AND SEWER To begin with, we have budgetary sheets.

article thumbnail

Revit Beginners: Utility Lines Workaround

Revit Beginners

Goto Drafting. Combining repeating details and detail lines you now have a workaround for creating utility lines for gas, elec, phone, sewer, storm drain, etc. Marathon Drafting. Find Consultants. Detail Component and import your DWG into your new Detail Component. Load this Detail Component into your project. Properties.

Revit 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 98 Agreement between Single-Purpose Entity and Consultant – Integrated. 22 13 13 Facility Sanitary Sewers. 23 51 13 Draft Control Devices. Draft Control Fans. Draft-Induction Fans. 23 65 13 Forced-Draft Cooling Towers. Open-Circuit, Forced-Draft Cooling Towers. Draft Control Fans.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 98 Agreement between Single-Purpose Entity and Consultant – Integrated. 22 13 13 Facility Sanitary Sewers. 23 51 13 Draft Control Devices. Draft Control Fans. Draft-Induction Fans. 23 65 13 Forced-Draft Cooling Towers. Open-Circuit, Forced-Draft Cooling Towers. Draft Control Fans.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. AZ Fast Grant: Up to $7,500 grant to pay for consulting services to advance Arizona-based technology companies. Human Resource consulting on Arizona’s labor laws.

Income 108