Remove Definition Remove Estimating Remove Negotiation Remove Overhead
article thumbnail

Myths Behind Construction Estimating

Construction Cost Estimating

Estimating is a vital process in a construction business as it can increase the profit margin of an owner to a great extent. So the estimating system in an organization should be authentic, uncomplicated, well-organized and speedy in order that owner can concentrate his focus on constructing his business.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

AFARS) The above definition of a unit price book clearly notes the requirement that the JOC unit price book reflect both local and current costs for the work to be performed using JOC. 5117.9001 Definitions. Coefficient” means a numerical factor that represents costs (generally indirect costs) not included in JOCPB unit prices (e.g.,

Contract 227
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

Definitions. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). Bonding must be sufficient to cover the stated estimated annual maximum contract value.

Contract 100
article thumbnail

Job Order Contract / Job Order Contracting – JOC: Do’s – Don’ts

Job Order Contracting

Build your knowledge of line item estimating with the JOC Unit Price Book. Verify line items, quantities, and coefficient(s) of internal Owner estimates and Contractor estimates. Follow Job Order Contract requirements with respect to bonding and overhead related costs. Maintain a limit of nonpre-priced line items.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

DEFINITIONS. The 4BT-CE(TM) JOC cloud estimating and project management system, or equivalent, shall also be used. coefficient (reference table of allowable overhead). Contractor’s UPB estimate of tasks and quantities of labor, materials, and equipment to do the work, plans and specifications, and project timeline.

Contract 100
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. This total or subtotal is usually identified as such in an estimate report. Also known as Total Estimated Contract Cost (TECC).

article thumbnail

JOB ORDER CONTRACT Glossary / Terms / Defintions – JOC , JOB ORDER CONTRACTING

Building Information Management

A set of definitions related to Job Order Contracting / JOC. to 1.20 multiplier applied to the the total of the line items for a project or task order estimate. It typcially includes all overhead items such as. A line item estimate taken from a job order proposal using the coefficient and.