article thumbnail

Women in Construction – As Told By Women

Construction Marketing

” Sarah Liles, an estimator and project engineer, also notes that women often need to self-advocate in a way that men don’t: “You have to take responsibility for your own education. About unions…. You see very few women in [the non-union] side, and if you do see them they’re holding a stop or slow sign or flagging.

Union 236
article thumbnail

“Once-in-a-Generation” Opportunity for Women in Construction: Infrastructure Investment & Jobs Act

Autodesk Construction Cloud

The White House states that it will drive the creation of union jobs and help grow the economy in a sustainable way that makes sure all people, including under-represented communities get ahead for decades to come. In fact, it’s estimated that this federal investment will add at least 1.5

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Fury over NHS ‘coronavirus scoring system’ which treats learning disability patients like a ‘sub-class of the population’

Construction Test

But it discriminates against people with learning disabilities who may need round-the-clock care, according University of London professor Irene Tuffrey-Wijne. . But it discriminates against people with learning disabilities who may need round-the-clock care, according University of London professor Irene Tuffrey-Wijne (pictured).

article thumbnail

Frail coronavirus patients may be denied critical care under NHS ‘scale’ system designed to free up ICU beds for those most likely to recover

Construction Test

It does not discriminate against age, but it does weigh up underlying conditions and overall health. . Hospitals across Britain are still 21,825 ventilators short of the estimated 30,000 it will need when the crisis is at its height. . BRITAIN STILL HAS NO-WHERE NEAR ENOUGH VENTILATORS.

Design 26
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor provides a detailed line estimate as the TO proposal, submitted to the Owner for review and approval, itemizing tasks and quantities of labor, materials, and equipment to do the work. Priority is established, a gross scope and cost estimate range is associated. Preliminary plans and specifications are generated.