Remove Document Remove Drawings Remove Insurance Remove Overhead
article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

If it is required to develop a new building or refurbish surviving property, the owner should have arranged a document so that the work & other portions of the construction project can be performed systematically. Each construction project should comprise of crucial documents that generally form the part of every construction contract.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 227
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

f) “Job order contractor” – a licensed, bonded, and general liability insured contractor awarded a job order contract. (g) The proposal may also contain approved drawings, work schedule, permits, or other documentation as the organization may require for a specific job order.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Construction documents help keep your projects organized and guide the construction process from start to finish. Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. .

article thumbnail

Construction Forms for excel

Construction Cost Estimating

The package of over 140 purpose built forms are customizable Excel templates and documents addressing all areas of construction contract work. Construction Forms screenshot Construction Forms for Excel are designed to facilitate contracting and administrative tasks for construction work and projects.

Lien 45
article thumbnail

Job Order Contracting Glossary

Building Information Management

The document may be referenced in the job order contract and may/or may not be directly provided by the creator of the unit price book and/or job order contract software. “Job order contractor” – A licensed, bonded, and general liability insured contractor awarded a job order contract. Also called Unit Price Guide, UPG).