10 Essential Types of Construction Documents

Autodesk Construction Cloud

Construction documents help keep your projects organized and guide the construction process from start to finish. Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. .

article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

If it is required to develop a new building or refurbish surviving property, the owner should have arranged a document so that the work & other portions of the construction project can be performed systematically. Each construction project should comprise of crucial documents that generally form the part of every construction contract.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 228
article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

(k) “Project scope of work” – the document and related drawings, specifications, and writings referenced therein which together set forth the specific requirements and work to be accomplished by the job order contractor in connection with an individual job order. (l) The prices shall not include overhead and profit.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Design changes can result in costly impacts to drawings or construction work in progress.

Design 130
article thumbnail

Types of Estimate found on various stages of a Project

Construction Cost Estimating

An estimator has to be very careful about the quantity takeoff using the given data such as drawings, specifications and other documents about the project. Direct Cost includes cost of materials, equipment, labor and subcontracted cost; while the Indirect cost includes overheads and contingency.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

The construction industry uses different kinds of agreements depending on the project’s scope, delivery, schedule, budget, and the parties involved. They also include overhead costs such as insurance, mileage, a portion of your office rent. In other words, the contractor is incentivized for controlling costs and staying on schedule. .