Remove Document Remove Drawings Remove Overhead Remove Subcontracting
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Design changes can result in costly impacts to drawings or construction work in progress. Advantages.

Design 130
article thumbnail

Types of Estimate found on various stages of a Project

Construction Cost Estimating

An estimator has to be very careful about the quantity takeoff using the given data such as drawings, specifications and other documents about the project. Direct Cost includes cost of materials, equipment, labor and subcontracted cost; while the Indirect cost includes overheads and contingency.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Construction Forms for excel

Construction Cost Estimating

The package of over 140 purpose built forms are customizable Excel templates and documents addressing all areas of construction contract work. Construction Forms screenshot Construction Forms for Excel are designed to facilitate contracting and administrative tasks for construction work and projects.

Lien 45
article thumbnail

Competitive Bid Estimating for construction - A brief overview

Construction Cost Estimating

RPF may be termed as a solicitation document, submitted by the owner, asking pricing and a technical solution for design and/or construction services. Construction bidding process starts with a set of contract documents. After reviewing all the plans and specifications the contractors make an estimate for the cost of the project.

Bidding 40
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Subcontracts. Job Orders / Task Orders.