Remove Documentation Remove Drawings Remove Overhead Remove Profitability
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

JOC unit prices include direct material, labor and equipment costs, but not indirect costs or profits which are addressed in the coefficient(s). general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a)

Contract 228
article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

(k) “Project scope of work” – the document and related drawings, specifications, and writings referenced therein which together set forth the specific requirements and work to be accomplished by the job order contractor in connection with an individual job order. (l) The prices shall not include overhead and profit.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Job Order Contract Unit Price Book Basics

Job Order Contracting

In addition, the ability to review and interpret construction drawings, work with cost estimating formulas and technologies, communicate information to disparate disciplines and audiences, and attention to detail are all additional requirements. Documenting and associated presentation of the estimate. Estimate preparation.

Contract 100
article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

For example, are drawings given to the general contractor 50% of the time? Information should include a description of current conditions including access, materials, dimensions, and a drawing/PDF, as well as a description and drawing/PDF of requirements. indicating “Per JOC Cooperative Contract”, on the appropriate document.

Bidding 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Rory Woolseys Construction Estimating Blog. Thursday, May 31, 2012. Mark It Up!

article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

A construction contract is a document that outlines the roles and responsibilities between two or more parties on a project. It is a legally binding document that the groups agree to at the start of a project and are held accountable to throughout. The contract would be solely based on those documents and the scope of work.