Remove Documentation Remove Engineering Remove Estimating Remove Inspections
article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

. • NEVER accept a lump sum estimate for a workorder/project without a full detailed line-item estimate and review of line-times and quantities. Fully audit cost estimate and actual cost information. Engineering News-Record (ENR). RSMeans Cost Data, This document is for construction cost reference information.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Structures with weight restrictions. After a major incident.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

A highway, road, street, bridge, utility, water supply project, water plant, wastewater plant, water and wastewater distribution or conveyance facility, wharf, dock, airport runway or taxiway, drainage project, or related type of project associated with civil engineering construction; or 2. Gov’t Code 2269.402. Gov’t Code 2269.408.

Legal 520
article thumbnail

JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

Some vital steps for concrete post-pour inspection

Construction Cost Estimating

This civil engineering article sheds light on the required steps for post-concrete inspection as soon as decluttering of any concrete structure is completed. The subcontractor will inform QA/QC that curing is retained by the submittal of curing records. Ensure that curing is retained for a prolonged time if necessary.

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

80% of cost overruns are due to poor scope of work definition, and associated inadequate and/or flawed construction cost estimates and otherwise poor planning, procurement, and project delivery management. Labor productivity value for each craft /work area needs to be estimated at a detail level as it will significantly vary.

Schedule 163
article thumbnail

Journal of Structural Engineering

The Constructor

Related posts: Journal of Environmental Engineering Journal of Management in Engineering Journal of Construction Engineering and Management Uncertainty in Structural Engineering SEMINAR / PROJECT TOPICS IN STRUCTURAL ENGINEERING Structural Analysis? Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.