Remove DOT Remove Drafting Remove Drawings Remove Inspections
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

Behind the Build: Interview with Matthew Keck, BIM Manager at Metromont 

Autodesk Construction Cloud

We are not a DOT company; we don’t do bridges, we don’t do highways. I continued grading until 2015, then went to school for drafting and design, where I was introduced to Autodesk products and BIM. We do government buildings, warehouses, schools, and parking garages. So I picked that up and used it post-graduation.

BIM 98
article thumbnail

35+ Product Updates for Autodesk Construction Cloud

Autodesk Construction Cloud

Users will now get a better understanding, and visualization, of their 2D drawings and 3D Models with hypermodel viewing and alignment. Users can choose 2D drawings to position on top of a sectioned 3D model to align and seamlessly navigate between. . RFIs | Quick List Action / Three dot menu . Coming soon. Photos | Locations.