Remove Drafting Remove Feasibility Remove Inspections Remove Sewer
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Building & Engineering Field Inspections 9. Re-Inspection Fee/Extra Inspections 15. ON-SITE WATER AND SEWER To begin with, we have budgetary sheets. In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. Fire Protection Systems Accessory 8.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Sewer Lines, Sewage Treatment Facilities.

Income 108