article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

From safety training and accident prevention to AR building assistance, technology does indeed belong on the drafting table and the construction site alike. Construction waste, fuel, emissions, and travel requirements have all led to a less than favorable view of construction when it comes to the green crowd. Supply Chain Issues.

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

As the region’s conduit to travel, BNA often serves as the first and last impression of Nashville for travelers. Recently introduced concepts, including Hissho Sushi, Vino Volo and Berry Field Bistro, now give travelers even more dining options at the airport. The Nashville Airports Experience. The world is taking note, too.

Risk 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The federal Bureau of Land Management, which has subsurface mineral rights for much of the Monterey shale field, in December sold about 15 leases for thousands of acres of potential shale development in California. It is anticipated that the Draft EIR will be brought before the Planning Commission for certification in March 2013.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

These ports are reminding cross-country destinations that they can still get containers to them faster over land than it will take the big ships traveling through the Canal to reach East and Gulf Coast Ports. Rail freight facilities in Los Angeles are being upgraded to make the turnaround times even faster. Johns River.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Draft regulators require slightly negative pressure in the combustion chamber at maximum input. On forced draft burners, gas manifold pressure requirements should correspond with modulating (butterfly) valve in full open position and stable at all other firing rates. Forced Draft Fan Blower motor. Burner, Gas or Oil.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. Small Producer Credit (AS 43.55.024(c)): Credit of up to $12 million per year for taxpayers incurring eligible oil and gas lease expenditures in North Slope operations.

Income 108