Remove Drawings Remove Fabrication Remove Lien Remove Visualization
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 01 43 19 Fabricator Qualifications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. 01 43 19 Fabricator Qualifications.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases. Borrowers inject 10 percent in the form of cash or equity in real estate.

Income 75
article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). approve project payments/draws. o Work with contracting personnel to: • Obtain lien waivers/release of liens if required. • Issue final payment. • Create budget variance report.