Remove Drawings Remove IDEA Remove Sewer Remove Zoning
article thumbnail

Revit Beginners: Utility Lines Workaround

Revit Beginners

This workaround involves drawing a repeating detail line (with imported text) on top of a simple detail line. Now draw a detail line in any view of your project. Draw your repeating detail over your new detail line as though tracing the detail line. Revit Zone. Monday, September 11, 2006. Utility Lines Workaround.

Revit 40
article thumbnail

Less Is More In New England

Business Facilities

The Granite Ridge Development District: The creation of the Granite Ridge Development District, a 913-acre commercial and entertainment zone, involved policy changes as well as active investment attraction. The short drive results in manufacturing space at a lower cost, while still drawing from the same educated workforce. The NH Dept.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. CALIFORNIA.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems. Examine structural features of sewer line, interior of manhole, manhole frame and cover, etc. Obtain and understand control system diagrams and identify zone thermostat locations.

article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

As a designated Foreign Trade Zone (FTZ), Oswego County is designed for the convenient and cost effective production of goods. All preliminary work such as extending utilities, rail, water and sewer is complete at both sites which are “ready to go and ready to market.”. Many food processing facilities require water for processing.