Remove Drawings Remove Overhead Remove Plans Remove Schedule
article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

There would be no difference between the expected cost and the actual cost if the calculation is properly and accurately planned. Appropriate estimation is planned by detailed estimation in specific item wise. To invite tenders and to plan contracts and manage the expenditure during implementation, an estimation is also mandatory.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

But that’s not all, the DoD doesn’t leverage current system thinking and robust, integrated planning, procurement, and project delivery workflows to maximize utilization of resource. 5117.9003-1 Planning and coordination. (a) shall not be acquired under a JOC. 5117.9003 Use of job order contracts.

Contract 228
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

h) “Plans and specifications” -the unit price book and the organization’s technical specifications. The proposal shall also contain a schedule for the completion of a specific project scope of work as requested by the organization. The prices shall not include overhead and profit.

article thumbnail

Types of Estimate found on various stages of a Project

Construction Cost Estimating

An estimator has to be very careful about the quantity takeoff using the given data such as drawings, specifications and other documents about the project. Direct Cost includes cost of materials, equipment, labor and subcontracted cost; while the Indirect cost includes overheads and contingency.

article thumbnail

(Still) Waiting for the Home Building Technology Revolution

Pro Builder

They thought scheduling was “pretty good.” . But despite access to an online scheduling portal from a big-name software company, most of the actual scheduling and updates were done by the field superintendent by phone. The very best ran schedules of 60 to 65 days, with some even in the low 40s. Technology wasn’t a factor.

article thumbnail

Electrical Utility Construction Estimator

Construction Cost Estimating

Estimating experience on electrical utility projects in the following construction and maintenance areas is preferred: Distribution, Overhead Distribution, Underground Substation Transmission We are looking for a project estimator with strong time management skills and who is team-oriented. Overnight travel may be required.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Contractor’s UPB estimate of tasks and quantities of labor, materials, and equipment to do the work, plans and specifications, and project timeline. The UPB costs should NOT include contractor overhead and profit. Scheduling. If the plans and specifications do not.

Contract 100