article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Planning, procurement, and project delivery is inefficient and disparate. Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Owner has less control (vs.

Design 130
article thumbnail

Why You Need Integrated Construction Software

Viewpoint Construction Technology

The data has to be re-entered into their back-office system, which takes extra time and requires additional staff overhead. Field employees add notes, drawings, documents, photos, videos and voice messages to punch list tasks via a mobile device. Field staff time tracking. Employees log time on paper, via a spreadsheet.

Software 130
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

But that’s not all, the DoD doesn’t leverage current system thinking and robust, integrated planning, procurement, and project delivery workflows to maximize utilization of resource. as-built drawings and warranties). Architect-engineer services as defined in FAR 36.102 and Design-Build requirements as defined in FAR 36.3

Contract 228
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes. The UPB costs should NOT include contractor overhead and profit. UPB rate and the Contractor’s multiplier. Field Office Expense.

Contract 100
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors. Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids.

Bidding 40
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

article thumbnail

Developing a Job Order Contracting Program

Building Information Management

The article also introduces the use of Performance Based Procurement System (PBPS) to set a “minimum performance” requirement and improving the performance of the JOC process. The article introduces the Center for Job Order Contracting Excellence (CJE) and the first documented performance of JOCs. Introduction. Submit the bid.