Remove en about-accelerators
article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

ex: If you’re concerned about reducing the variability from batch to batch, you may want to optimize the mix to have a low degree of production variance. Having a concrete admixture partner helps with these making informed decisions that improve ROI and accelerate the project timeline. What are your goals? (ex:

Concrete 125
article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

ex: If you’re concerned about reducing the variability from batch to batch, you may want to optimize the mix to have a low degree of production variance. Having a concrete admixture partner helps with these making informed decisions that improve ROI and accelerate the project timeline. What are your goals? (ex:

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

ex: If you’re concerned about reducing the variability from batch to batch, you may want to optimize the mix to have a low degree of production variance. Having a concrete admixture partner helps with these making informed decisions that improve ROI and accelerate the project timeline. What are your goals? (ex:

article thumbnail

Microsoft Plans To Purchase LinkedIn for $26.2 Billion Cash

Buisness Facilities Contributed Content

LinkedIn, based in Mountain View, California, has over 128 million users in 200 countries/territories and averages about 2 new members per second. Together we can accelerate the growth of LinkedIn, as well as Microsoft Office 365 and Dynamics as we seek to empower every person and organization on the planet.”. Pacific Time/11:45 a.m.

Plans 40
article thumbnail

15 Management Systems to Help You Avoid the High-Speed Wobbles

Pro Builder

The silver lining: It was an opportunity for new home builders to enter the market as it recovered, and demand for new housing slowly but surely accelerated thanks to a Recession-induced shortfall of 3.8 Construction costs have increased by about 12% overall and lumber is back on an upward trajectory, or is at least volatile.

article thumbnail

ARM port of EEL2 - Cockos Confederated Forums

Construction Dive

youtube) works ok even without hardware acceleration and high AGP transfer rates. --. Im about to push some new EEL changes online, including a bytecode interpreted mode (that is portable). Im about to push some new EEL changes online, including a bytecode interpreted mode (that is portable). Forum de REAPER en français.

article thumbnail

There are three things Britain needs to get out of coronavirus lock-down: Treatments, reliable infection data and mass testing. And we don’t have ANY of them

Construction Test

widely considered to be about a fortnight ahead of the UK, is today expected to prolong its shutdown until May 3 as it grapples to get COVID-19 under control. The UK’s coronavirus outbreak appears to be coming out of its rapid acceleration phase this week, Government scientists have cautiously pointed out.