Remove en services hybrid-infrastructure-services hybrid-infrastructure-managed-services
article thumbnail

Why the ASTM C94 revision to accept water additions in transit matters

GCP Applied Technologies

In 2013, the ASTM C94/C94M Standard Specification for Ready-Mixed Concrete was revised to allow water additions during transit, for trucks equipped with automated slump and water management systems. An in-transit concrete management system can especially aid concrete producers when a maximum w/c is specified by the purchaser.