PUMPED CONCRETE PUMP TYPES & SELECTION
The Constructor
NOVEMBER 28, 2011
This method is used where large quantity of concrete work is involved at greater height, where other means of transporting is not easy to do.
The Constructor
NOVEMBER 28, 2011
This method is used where large quantity of concrete work is involved at greater height, where other means of transporting is not easy to do.
The Constructor
MARCH 20, 2012
From the diagram above, we can see how the process unfolds.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
The Constructor
MARCH 20, 2012
Cleanliness: when repairing concrete, care must be taken to remove any dirt or dust that will prevent the repair concrete bonding with the parent concrete. Expediency: The longer the repair is left, the more work has to be done, and the less likely that the repair will blend in.
The Constructor
APRIL 2, 2012
The bearing length should be atleast 75mm to avoid spalling of the edges.
The Constructor
NOVEMBER 15, 2011
Bonding is essential to eliminate conyinuous vertical joints both in body as well as on the face of wall. The course of brick work in which all the bricks are laid as stretchers is known as stretcher course. Bond : This is the method of arranging bricks so that the individual units are tied together.
Job Order Contracting
SEPTEMBER 12, 2018
Preventative maintenance is critical to facilities occupant health and safety, as well as meeting an organization’s fiduciary responsibilities. via Four BT, LLC – 4BT enables owners to consistently deliver quality facilities repair, renovation, and minor new construction projects on-demand, on-time, and on-budget.
The Constructor
MARCH 23, 2012
With the proliferation of computer programs available a three-dimensional analysis presents no great difficulty provided the modeling techniques fully reflect the behavior of the structure.