article thumbnail

Small firms act big: A different (and powerful) route to success

Construction Marketing Ideas

After quite a bit of research and sifting, I reported on Philadelphia-based parking consultants Timothy Haas And Associates, Inc. , who have achieved credibility through contributions to the United Nations Economic and Social Commission for the Asia and Pacific’s report on low-carbon green growth.

article thumbnail

FEATURE STORY: 2013 Economic Development Deal of the Year Awards

Buisness Facilities Contributed Content

Noting that the rolling pasture land was less than 20 miles from Atlanta’s international airport, the Pinewood team indicated it was a feasible location for their new studio complex. The design of the Philadelphia headquarters expansion will begin in this year, with groundbreaking expected in 2017.

Deals 107
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

don't think: Do Revit: Autodesk Blogger Day: Revit Server

Do

There are some limitations since it is Version 1, but for the first time I can truly say we have feasible, solution sourced from Autodesk that allows our different offices to collaborate together on projects. Philadelphia Revit Users. Revit Beginners. Revit Family Man. Revit Inside (list of Revit firms). Revit Job Captain. Revit Zone.

Revit 40
article thumbnail

Pennsylvania Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

These areas are defined as counties outside of the Philadelphia MSA and those with populations below 1 million. Grants for planning and feasibility studies up to 50% of the total cost of the planning project or $175,000, whichever is less. Grants shall not exceed $5 million and have a term of not more than five years.

article thumbnail

When office-to-residential conversion works

BD+C

The Older, the Better Cities such as DC, Philadelphia, and New York also have a significant share of older, prewar office buildings that were constructed before modern HVAC systems allowed acres of interior space that’s artificially lit and mechanically ventilated. Such spaces could generate more revenue than basic storage rooms, he says.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

DREDGING THE DELAWARE AS PHILADELPHIA GETS READY. A massive, $300-million Delaware River dredging project is helping the Port of Philadelphia get post-Panamax Ready. A deeper shipping channel will allow us to welcome a wider variety of cargo vessels to the Port of Philadelphia. percent gain in cargoes handled.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Value engineering program is commonly carried out in the systematic stages of; feasibility, concept design, design development, construction and operations and occupancy phase of the projects (Table 1). In Proceedings of APWA International Public Works Congress, Philadelphia , Sep. Held on 24th – 25th, 2005 in Kuala Lumpur, Malaysia.