article thumbnail

Public Procurement Professionals

Job Order Contracting

Enhancing Integrity in Public Procurement, requires public sector procurement professionals to improve their performance in achieving efficiency and advancing public policy objectives. Well-governed public procurement contributes directly to greater public trust, enhanced well-being and more prosperous and inclusive communities.

article thumbnail

Technology will NOT SOLVE Construction Productivity Woes.

Job Order Contracting

As noted by Deming, 85% of all failures are due to management and lack of process versus those doing the work! 1998, Krafcik, The Triumph of the Lean Production System The post Technology will NOT SOLVE Construction Productivity Woes. appeared first on 4BT. appeared first on 4BT.

Products 184
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Learning about Job Order Contracting?

Job Order Contracting

JOC is both a procurement mechanism and a project delivery method. When designed and managed properly, JOC integrates planning, procurement, and project delivery processes and teams under a consistent programmatic workflow. Do I need to procure a set of technical specifications from a JOC products and services provider?

Contract 215
article thumbnail

ANZ Infrastructure Industry Well-Positioned to Meet 2030 Benchmarks and Achieve Net Zero by 2050

Autodesk Construction Cloud

In a first-time collaboration Autodesk (NASDAQ: ADSK), Australian Constructors Association , Consult Australia and the Infrastructure Sustainability Council have released a joint report to support industry in accelerating a net zero future through the design and construction of the infrastructure pipeline. .

article thumbnail

Living in a Materials World

Viewpoint Construction Technology

Effectively managing the materials on jobsites with modern software can have a significant impact on contractors bottom lines. But along the way, those material costs can start to add up, especially if the materials aren’t procured and managed properly. Every built environment turns raw materials into polished projects.

Materials 205
article thumbnail

Why Now is the Time for Sustainable Construction

Autodesk Construction Cloud

But when it comes to construction, any building or infrastructure project completed today will most likely still be operational in 2050. In the next few years, spending on infrastructure by Australia’s state and federal governments is expected to top $166 billion. The push for sustainable construction.

article thumbnail

FREE Cloud-based Construction Collaboration Tool

Job Order Contracting

Reduce costs and improve efficiency for buildings and infrastructure projects by consolidating and seamlessly exchanging information throughout the design, procure, build, and operations life-cycle. Improved Collaboration Translates to Great Efficiency.