article thumbnail

Why Now is the Time for Sustainable Construction

Autodesk Construction Cloud

But when it comes to construction, any building or infrastructure project completed today will most likely still be operational in 2050. The push for sustainable construction. In the next few years, spending on infrastructure by Australia’s state and federal governments is expected to top $166 billion. Conclusion.

article thumbnail

Technology will NOT SOLVE Construction Productivity Woes.

Job Order Contracting

As noted by Deming, 85% of all failures are due to management and lack of process versus those doing the work! 1998, Krafcik, The Triumph of the Lean Production System The post Technology will NOT SOLVE Construction Productivity Woes. appeared first on 4BT.

Products 183
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

FEDRAMP is Hindering Facilities Management in the Federal Sector

Job Order Contracting

6 It important that commercial SaaS providers, and the associated infrastructure used to deploy SaaS products, meet appropriated compliance requirements for specified levels of security as developed by NIST. Our products are hosted on Microsoft AZURE, and Amazon AWS in the United States, both hosting infrastructures are FEDRAMP compliant.

article thumbnail

ANZ Infrastructure Industry Well-Positioned to Meet 2030 Benchmarks and Achieve Net Zero by 2050

Autodesk Construction Cloud

In a first-time collaboration Autodesk (NASDAQ: ADSK), Australian Constructors Association , Consult Australia and the Infrastructure Sustainability Council have released a joint report to support industry in accelerating a net zero future through the design and construction of the infrastructure pipeline. .

article thumbnail

Building with Timber: Embracing Construction Technology for a More Sustainable Future

Autodesk Construction Cloud

Sustainability is a key focus in today’s construction sector. Dura Vermeer, a family-owned company, has 167 years of experience in construction, real estate, infrastructure and engineering. Sustainability in Action. This structure is designed with disassembly in mind using more sustainable materials.

article thumbnail

Public Procurement Professionals

Job Order Contracting

The above is particularly true for physical infrastructure repair, renovation, sustainability, and new build projects. In point of fact, paying a percentage fee to a “JOC consultant” for tools and services is up to 10x more expensive than simply paying for annual software and cost data subscriptions, and any required training.

article thumbnail

A Sustainable, Connected Workflow Improves Data Workflow between Field and Office, Surveyors, and Equipment Operators

BD+C

A Sustainable, Connected Workflow Improves Data Workflow between Field and Office, Surveyors, and Equipment Operators 1 kcichowicz Thu, 03/23/2023 - 09:36 Rachel Jones, Trimble Customer Profile: Peace River Hydro Partners is a joint venture between ACCIONA Infrastructure Canada Inc. and Samsung C&T Canada Ltd.

Office 52