Construction Forms for Excel include : Estimation Forms for Construction: Bid Plan Log, Time and Materials Log, Estimate Sheet, Job Estimate, Telephone Bid Sheet, Itemized Proposal, Job Cost Report, Take Off Estimate, Time and Materials Estimate, Request for Proposal Log, Overhead Calculation.

Lien 45
article thumbnail

#66:  Labor Inefficiency Costs: Who Pays? How Much?

NH Construction Law

Sometimes this unanticipated time/space compression is the owner’s fault, in which case the general contractor/construction manager and its subcontractors will likely be entitled to increased compensation by change order or otherwise -- and to a mechanic’s lien if that increase is not paid. In Fraser Engineering Company, Inc.

Lien 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

JOC, an annual contract and multiple option year agreement for general construction, generally requires the Contractor to e furnish associated labor, tools, materials, equipment and transportation. All cash discounts should be deducted in determining material costs. Job Orders / Task Orders.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Material Testing Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Material Testing Information.