Remove Materials Remove Overhead Remove Permits Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

#98:  Good Faith Limits on Termination for Convenience

NH Construction Law

They operate very much like “at will” employment contracts, permitting the employer to fire an employee at any time for any (or no) reason as long as some specific public policy is not offended. Such a provision was part of a commercial painting subcontract in Hate to Paint, LLC v. Ambrose Development, LLC , No.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 31 25 Existing Material Information. 00 31 46 Permits.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 31 25 Existing Material Information. 00 31 46 Permits.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.