article thumbnail

CE CALC – An exclusive online calculator for Civil and Structural Engineers

Construction Cost Estimating

CE Calc Civil Calculator refers to a useful construction tool for civil engineering calculation. It is specifically designed for the civil and structural engineering professionals so that they fulfill their design requirements. Open Channels: Flow velocity, discharge, slope, weirs, Parshall flume and Froude Number.

article thumbnail

All About Floating Houses | What Are Floating Houses | Type of Floating Houses | What Is Floating Building | Floating Architecture Examples

CivilJungle

Floating houses are permanently connected with electrical wirings, plumbing lines, sewer lines, etc. The weight of concrete is too heavy that’s why to reduce the weight of the whole structure engineers includes wooden particle or plywood particle for constructing the whole structure. What Is Floating Building?

Housing 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Functions of Foundation | Requirements of Good Foundation | Types of Foundation | Types of Shallow Foundations | Types of Deep Foundations

CivilJungle

Foundation Engineering is a branch of civil engineering which deals with the design and study of the foundation of the structure. Foundation Engineering is used to apply the knowledge of soil mechanics, structural engineering, rock mechanics and geology to study and design the foundation of the buildings.

article thumbnail

10 Signs of Bad Concrete Pour

CivilJungle

Concrete is used in the construction of culverts and sewers. If the crack is larger or growing larger (an “active” crack ), or one side of the crack is higher than the other, then you may need to have the work reviewed by a structural engineer. Concrete is also used in the construction of foundations and basements.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CISP: Cast Iron Soil/sewer Pipe. SCFT: Structural Clay Facing Tile. SE: Structural Engineer. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint. CK: Caulking.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. SCFT: Structural Clay Facing Tile. SE: Structural Engineer. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint. CK: Caulking.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. SCFT: Structural Clay Facing Tile. SE: Structural Engineer. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint. CK: Caulking.