Credible Construction Estimate Core Elements

Job Order Contracting

Locally researched labor, material, equipment, and productivity data is essential in the devlopement of a credible construction cost estimate. ENR economic index, etc.) applied to a outdated cost estimate will introduce significant error. 3# Local Market – All cost data must be based upon local market conditions.

article thumbnail

Schedule LOD’s – Levels of Detail for Construction Schedules

Building Information Management

Jelen’s Schedule Levels. Functionally there is very little practical application for a schedule that is only a single bar other than to represent an element of a project or program time line. Level zero schedules normally will include the project or program major milestones and bars indicating key scope. Schedule Level.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. 1 comment: Suppliers of Catering Equipment. Site Information. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Search This Blog and Others Listed on this site. Delete Sheets In Browser or Schedules.

Revit 71
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. Site and Infrastructure Subgroup: Divisions 30 – 39. 1995 Edition.

article thumbnail

3D Printing in Construction: Growth, Benefits, and Challenges

Autodesk Construction Cloud

For more than a decade, 3D printing has been used in several ambitious initiatives and projects in construction, including: In 2004 , a USC professor attempted to 3D print a wall in what’s widely accepted as the technology’s first entry into construction. It wasn’t long before it was administered for more ambitious construction purposes.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. Site and Infrastructure Subgroup: Divisions 30 – 39. 1995 Edition.