Remove 2006 Remove Consulting Remove Documentation Remove Schedule
article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Shorter construction schedules than planned. 2004; Black et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Bemelmans, J.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

I can then produce a mass floor schedule to view the floor area. Yeah, in the context of the thread at Revitforum the comment was quick, and in a link.didn't care about retaining the information or documenting it. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10).

Revit 65
article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

From the readme documentation for what has been addressed with the service pack: Autodesk® Revit® Platform 2013 Enhancements. Improves consistency of unit formatting within Panel Schedules. Panel Schedule and Load Calculation Addition. ► 2006. ► December 2006. (14). ► October 2006. (5).

Revit 61
article thumbnail

Revit OpEd: Revit 2013 - View Types

Revit OpEd

One curious thing that is documented at the WikiHelp site regarding these new view types , changing a view from one type to another does not actually apply the view template change that is assigned (if any) to the view. Tip: Theyve added View Template to the available fields in View Lists (schedule) so it can be managed there too.

Revit 58
article thumbnail

Revit OpEd: A Case for User Keynotes

Revit OpEd

As far as a schedule to summarize them, then purchasing and installing them is concerned the faceplates and back boxes are potentially identical. Notes have always been an issue with electronic documents. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10).

Revit 56
article thumbnail

Revit OpEd: Due Diligence

Revit OpEd

Meanwhile, autodesk provides dismal documentation. If you want a model of where we're going, look at manufacturing - ISO compliance, material takeoffs from the design product, and even scheduling and means & methods. Panel Schedule and Load Calculation Addition. ► 2006. ► December 2006. (14).

Revit 58