article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. How about instead having a Rooms explorer, like you can explore Schedules, Sheets and Families? Whadya think?

Revit 56
article thumbnail

Facilities Management Key Performance Indicators

Job Order Contracting

30) Scheduling intensity. (31) 42) Quality of scheduling. (43) 43) Schedule realization rate. (44) 44) Schedule compliance. (45) 30) Scheduling intensity. (31) 42) Quality of scheduling. (43) 43) Schedule realization rate. (44) 44) Schedule compliance. (45) 2) Visual comfort (e.g.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Panel Schedule and Load Calculation Addition

Revit OpEd

Panel Schedule and Load Calculation Addition. Panel Schedule and Load Calculation Addition. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10). ► August 2006. (8). ► July 2006. (6). ► June 2006. (13). ► May 2006. (10).

Revit 53
article thumbnail

Annotation Symbol as Schedule

Revit OpEd

You could create additional parameters (project parameters) and create a schedule to report the information if you assign them to a category you may not be likely to use in your normal scope, something that you won't use and won't likely have a schedule stumble on that same category if there are linked files.

article thumbnail

DO NOT DRIVE - '06 Ford Ranger Pickups & Mazda B-Series Trucks

Construction Equipment

Department of Transportation’s National Highway Traffic Safety Administration (NHTSA) is deeply concerned that certain higher-risk model year 2006 Ford Rangers and Mazda B-Series trucks with defective Takata airbags are not being repaired fast enough.

Safety 49
article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Home News Videos Tips Building Building Bye Laws Building Materials Aggregates Cement Wood Building Tips Buildings Green Buildings Flooring Formwork/Shuttering Paints & Decoratives Skyscrappers Smart Materials Concrete Concrete Admixtures Concrete Cracks Crack Repair Concrete Durability Concrete Properties Concrete Types Fibre reinforced Fire Proof (..)

Concrete 115
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Shorter construction schedules than planned. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2004; Black et al., 2000; Grajek et al., 2000; Gransberg et al., Lower project related cost growth. Bemelmans, J.,