Remove Accidents Remove Fabrication Remove Feasibility Remove Guidelines
article thumbnail

PPE for Industrial Safety

Safety Services Company

Hand and arm: Durable work gloves, fabric/coated fabric protection gloves, chemical/liquid resistant gloves, and insulating rubber gloves. PPE is the last line of defense, and should only be used when engineering controls and administrative controls aren’t feasible. Here are some guidelines to follow when using this type of PPE.

Safety 48
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

Four (4) areas considered as components of life-cycle assessment (LCA): 1) Materials Manufacturing: Removal of raw materials from earth, transportation of materials to the manufacturing locations, manufacture of finished or intermediate materials, building product fabrication, and packaging and distribution of building products.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. 50,000 (max.) for projects creating at least 100 jobs.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

In addition to the qualifying expenses, at least 25 percent of the workforce on every project must be Colorado residents in order for the project to meet state incentive guidelines. Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program.

Income 75