article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

I also oversee the development life cycle, starting with due diligence, all the way up through the end of construction and through the warranty period. When you're inputting cost data, plan data, or change data into the system, it lets you visualize where the project is at any given point. That's six different agreements.

Design 80
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. In the Capital Planning Branch he supports the implementation and coordination facility life cycle management (FLCM) tools, research and policy. 3:30 – 4:15 PM BSI – Product Room.

BIM 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. In the Capital Planning Branch he supports the implementation and coordination facility life cycle management (FLCM) tools, research and policy. 3:30 – 4:15 PM BSI – Product Room.

BIM 40
article thumbnail

AU 2023 Day 2 Recap: Key Highlights from the Construction Industry Forum

Autodesk Construction Cloud

3D progress tracking colorizes the model, giving teams an easy way to visualize the status of any material, asset, or location – all in 3D. Autodesk Takeoff connects the entire construction life cycle and helps professionals make accurate takeoff from available data.

article thumbnail

Job Order Contract Cost Estimating

Job Order Contracting

GPS mapping/visualization. Support and training from a team that has decades of experience LEAN consturction delivery and life-cycle facilities / infrastructure asset management. Service Level Agreement. Report generation and export to Excel or Adobe PDF. Document version control. Document access control.

article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards. BIM Life-Cycle Views. The closeness of agreement within individual. Life-cycle Assessment. Life-cycle Costs. Discipline.

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.