article thumbnail

Staying in control with fabric cladding

Construction Specifier

Tension fabric structures have served a key role as a cost-effective facility solution for years. In some cases, users have turned to fabric buildings when brick-and-mortar construction is not economically feasible or would take too long to complete. The fabric building market remained stable, but also stagnant, for a long time.

article thumbnail

More about design drawings and model planning

Construction Cost Estimating

Plans are like a set of drawings or two-dimensional diagrams that are used to narrate a place or object or to communicate building or fabrication instructions which are drawn or printed on paper and can take the form of a digital file. So these design drawings can be categorized as: • Feasibility studies. and many more.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Green Home Building and Sustainable Architecture: Yurts: Living in.

Natural Building

Green Home Building and Sustainable Architecture. Sustainable architecture is an exciting and important field, with many people reviving traditional methods of building and others creating innovations to established practices. The Open Architecture Network. The Earthbag Architecture of Akio Inoue. Straw/Cement Blocks.

article thumbnail

Race to the Top

Buisness Facilities Contributed Content

Dennis Poon, vice chairman of the Thornton Tomasetti architectural firm and chief structural engineer of some of Asia’s tallest buildings, told The New York Times that Zhang’s design is feasible but has significant drawbacks. Zhang’s ultra-high-speed modular method.

article thumbnail

Cracking the code of affordable housing

BD+C

Public housing “often gave anonymity and feelings of isolation to people living in those high-rises,” says Liebman, who was the chief of architecture for the New York State Urban Development Corporation (now Empire State Development) from 1969–1975. Even better, Calleri says, residents don’t need a car to traverse the city or get to work.

Housing 104
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Value engineering program is commonly carried out in the systematic stages of; feasibility, concept design, design development, construction and operations and occupancy phase of the projects (Table 1). Building in this context involve the building’s fabrics, structure and engineering services. 12004 pp9-19 ISSN 0969-9988. Kiyoyuki, K.,

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Determining the feasibility of using other DoD contracts. The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6. To include considering historical information, projected funding opportunities, projected mission changes and bed-downs. 3.5.3.1.7.