Remove Change Orders Remove Drawings Remove Modeling Remove ProCore
article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

Over the next few months, Korte’s civil consultant TWM and Hershey’s in-house Building Information Modeling (BIM) team surveyed their existing structure, then shared these 3D point clouds with our team. Whenever a change order landed in Alex’s inbox, he would confer with Darlene. Here, we had both. And did both.

Design 52
article thumbnail

Trends in Construction: 3 Ways Technology is Changing Commercial Construction

HardHatChat

We would send those drawings to a printer to copy enough sets to distribute to all the trade partners we were asking to bid the project – often 50 or 60 copies. This time and expense added up to a pretty significant investment.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

GOBIM application creates the scope to operate 3D BIM models and their related data on the basis of the factors like number of triangles, number of parameters, and number of materials. FingerCAD This construction app can be used to generate technical drawing by applying your fingers through computer.

article thumbnail

For Construction Technology Manager Alex Ayres, it’s not just about technology

The Korte Company

And he loved the designing and drawing. The Korte Company was already using modeling software, but Alex saw an opportunity to use new technologies for even better outcomes — especially when it came to scheduling and information sharing. “It Ideally, folks in the field can reference the model just as reliably as paper drawings.

article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

GoBIM : With GOBIM application you can navigate 3D BIM models and their associated data easily as BIM applications are widely used in the construction industry today. The size of the model handled by GoBIM depends on three factors- number of parameters, number of triangles and number of materials.

iPad 45