Remove Design Remove Documentation Remove Engineering Remove Life Cycle
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

Construction Document Information Management

Job Order Contracting

Construction Document Information Management is central to productivity improvement. Construction Document Information Management. Streamlining Construction Document Information Management processes is an essential step towards improving productivity, quality, and overall value for all stakeholders. 2017, Cholakis, P.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Bring Your Facility Manager to Your Next Design-Build Project  

Autodesk Construction Cloud

Close the data gap from AEC to operations The critical step for closing the AEC and operations data gap : involve facility managers in design and build data management processes as early as possible. While the formative stages of new projects bring together design and construction teams, facility managers often have more limited representation.

article thumbnail

Get a competitive edge in your construction projects with value engineering

BD+C

Get a competitive edge in your construction projects with value engineering 1 kcichowicz Thu, 05/18/2023 - 11:53 Trimble Over the past half-century, value engineering (VE) has proven to be an effective tool to manage time, costs, and quality with an aim to maximize value. What is value engineering?

article thumbnail

Efficient Construction Delivery – Life-cycle management of the build envrionment

Building Information Management

Certainly it has been don within certain areas such as cost estimating using common / well designed cost databases with integrated contract, project, and document management. However across the full life-cycle of a structure? Traditional linear construction delivery methods such as design-bid-build are antiquated.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. A CRITICAL REVIEW OF VALUE MANAGEMENT AND WHOLE LIFE COSTING ON CONSTRUCTION PROJECTS.

article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

Project Delivery Phase Transitions: Estimates should be tracked throughout the life of the project and assumptions and estimate information must be well documented, including changes and what is and what is not in the estimate. The documentation should be in a form that can be understood, checked and verified.