article thumbnail

Electric fleet challenges and considerations

CK Power

Challenges posed by the present-day electrical grid There are inconveniences inherent in working with any new tech (like high cost of implementation, difficult integration with current equipment and a lack of standardization on key components). come from the electrical grid itself and how unfeasible it makes battery charging.

article thumbnail

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

BD+C

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection 0 dbarista Mon, 11/27/2023 - 15:08 Engineers Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Customized client-specific data.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BD+C

rcassidy Mon, 06/05/2023 - 12:44 Andrew Lehrer and Tyler Jensen, Environmental Systems Design A significant climate impact can be achieved with hybrid electrification that balances capital expenditure and operating expenses. The green power market, a subset of the larger electricity market in the U.S.,

Site 98
article thumbnail

Net Zero Carbon: A Quick Plug for All-Electric Buildings

Stok

An important step towards eliminating operational carbon is for buildings to go all-electric. All-electric buildings help reduce carbon emissions in three major ways: 1. By carefully selecting appropriate strategies, all-electric buildings on a wide scale can be cost effective in the long-term while mitigating climate change.

article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

Definition of Design Period: Design period could be defined as the number of years in the near future in which the supply will surpass the demand. Why Design Period Is Provided? The main reasons behind providing Design Periods are: It is prodigiously strenuous or unfeasible to produce frequent. Life of the structure.

Design 52
article thumbnail

ANSI B11 and risk assessment: The best kept secret in safety

FDR Safety

At the recent ASSE Professional Development Conference, there was considerable focus on risk assessment, voluntary standards and prevention through design. Risk assessment, or RA for short, will guide you in the application of feasible risk reduction controls. Risk assessment is one of the most powerful safety tools we have.

Risk 120
article thumbnail

Develop a Commercial site with BRIKS Design-Build Group

BRIKS Design-Build Group

Develop a Commercial site with BRIKS Design-Build Group. In addition to this commercial buildings have an annual or bi-annual inspection by designated local authorities which makes sure that the building abides to all safety standards. BRIKS design-build group has one of the best crew which handles the related issues for you.