Remove terms-and-conditions
article thumbnail

New terms and conditions to be used on A9 dualling contract

Construction Law

Transport Scotland will use new, in-house terms and conditions for the Tay Crossing to Ballinluig project, part of the much delayed £3.7 billion A9 Dualling programme. To read more of this and every other news story on this site, please log in with your Construction Law membership account details.

article thumbnail

LOCALLY RESEARCHED Cost Data – Up to Date Unit Price Construction Cost Data

Job Order Contracting

Line item cost data representing local market conditions. Cost data is collected and represented in a consistent way – expanded CSI MasterFormat, industry standard terms and defintions. No use of location factors or economic factors – actual local market labor, material, and equipment costs.

CSI 195
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ChatGPT Answers – RSMeans versus locally researched cost data

Job Order Contracting

Customization for Project Characteristics: Local data allows for a more precise estimation of costs based on the unique characteristics of a project, such as site conditions, climate, and availability of resources. Both options have their advantages and limitations.

article thumbnail

The Impact of ASC 842 – The New Lease Standard Is Here

Construction Business Owner

Going forward there will be a long-term asset offset by a current liability and a long-term liability. Operating leases will require lease expense to be recognized on a straight-line basis over the lease term. These types of transactions are not always sufficiently documented, and terms and conditions may not be at arm’s length.

Leases 177
article thumbnail

Phase l Environmental Site Assessment Standard Being Revised

Green Building Law Update

The initial draft includes: What purports to be an only modest change to REC definition is proposed, but this modification to that ultimate defined term risks negatively impacting the value of hundreds of millions of dollars of real estate each year. A de minimis conditions is not a recognized environmental condition.”.

Site 296
article thumbnail

Construction Cost Estimating Factors

Job Order Contracting

Data architecture (standardized, common terms, definitions, information formats). Local and general market conditions. Construction Cost Estimating Factors 2022 – Construction Cost Estimating Factors that determine validity, transparency, and level of cost management capability. CORE PRINCIPLES. Environmental aspects.

article thumbnail

The Myth Of Zero Energy And Its Adverse Impact On Prevention Through Design

FDR Safety

THIS ARTICLE IS FOCUSED ON prevention through design (PTD) and why use of the term “zero energy” lockout/tagout (LOTO) for all service and maintenance tasks creates a range of adverse impacts. The term “zero energy” is not the same as the control of hazardous energy, and is not found in any OSHA regulations or materials or in U.S.

Design 156