Remove Design Remove Electrical Remove Feasibility Remove Materials
article thumbnail

Electric fleet challenges and considerations

CK Power

Challenges posed by the present-day electrical grid There are inconveniences inherent in working with any new tech (like high cost of implementation, difficult integration with current equipment and a lack of standardization on key components). come from the electrical grid itself and how unfeasible it makes battery charging.

article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

Definition of Design Period: Design period could be defined as the number of years in the near future in which the supply will surpass the demand. Why Design Period Is Provided? The main reasons behind providing Design Periods are: It is prodigiously strenuous or unfeasible to produce frequent. Quality of Material.

Design 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is a Partition Wall | Uses of Temporary Interior Wall | Walling Materials | Types of Interior Wall Materials | Types of Partition Walls

CivilJungle

The walls that make for division or privacy in the interior portion of a building and not Carried the ceiling load And floor load and that would make With bricks, glass , or other more materials is called partition walls. In temporary interior wall doesn’t contain electric wiring lines or plumbing lines. Walling Materials.

article thumbnail

2024 International Energy Conservation Code Will Use a New Development Process

Pro Builder

The ICC Board also added that changes must be “technologically feasible, and life cycle cost effective, considering economic feasibility, including potential costs and savings for consumers and building owners, and return on investment.”. Requiring electric vehicle charging capability or readiness. Requiring ASHRAE 62.2

NAHB 98
article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

Before a construction project can begin, there is a lot of planning, number-crunching, designing, and scheduling that needs to occur. An architect, designer, or design-bid contractor will perform planning and engineering services for a prospective project owner, providing them with the information they need to move forward.

Risk 52
article thumbnail

Creating a sense of place with multipurpose K-12 school buildings

BD+C

James Krueger, AIA, NCARB, Design Principal Education Facilities K-12 Schools School Construction Designers Designers / Specifiers / Landscape Architects Facility Managers Architects Building Owners PreK–12 education has become far more sophisticated over the years, and school design must continually evolve to keep up with current and future needs.

Design 98
article thumbnail

The Benefits of Sustainable Construction

Building Radar

The construction industry , by its very nature, is one of the largest consumers of materials and produces more waste than any other sector. Environmental Perspective The construction sector is responsible for approximately 50% of the global consumption of raw materials. Not only that, the sector is also a major producer of waste.