Remove 2004 Remove Commissioning Remove Overhead Remove Zoning
article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

From an entrepreneurial standpoint, if you are a tech start-up you are going to have extremely high access for a very low cost and that will reduce your overhead significantly.”. The plan, announced July 2012, designates 17 solar energy zones totaling about 285,000 acres of public lands as priority areas for utility-scale solar development.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.