article thumbnail

#116:  Termination as a Condition of Performance Bond Liability

NH Construction Law

“In interpreting a multiple-document agreement, we seek to harmonize and give effect to the provisions of the various documents so that none will be rendered meaningless.” 771, 777 (2004). million,” id. Why would that consent be necessary if the surety is exonerated by substantial completion ?

article thumbnail

constructionattorneyblog: Subcontractor's Mechanics lien allowed.

Construction Lawyer

His book, Legal Guide to AIA Documents, published by Aspen Publishing, is in its fifth edition. The owner had hired a general contractor who, in turn, had subcontracted some of the work. See 770 ILCS 60/21.02 (West 2004). He is also a founding member of the Society of Illinois Construction Attorneys. University of St.

Lien 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or.