article thumbnail

Why Contractors Should Consider Hiring Us Over A Bookkeeper

Contractor Bookkeeping

No additional utility costs for heat, ventilation, air conditioning, lights, water, sewer and garbage. In 2004 Our Co-Founder Randal DeHart - Passed the PMP (Project Management Professional) exam after several years of construction project management experience and with an emphasis on systems engineering and process development.

US 48
article thumbnail

Automotive Industry Focus: Hitting On All Cylinders

Buisness Facilities Contributed Content

The Titan has been in production since 2004 and is assembled exclusively at the Canton facility. Strategic location and valuable assets are the foundation of Clarksville-Montgomery County, Tennessee’s appeal as a premier destination for industrial relocation and expansion. INFRASTRUCTURE, ACCESSIBILITY IN CLARKSVILLE-MONTGOMERY.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 82 13 Foundation Performance Requirements. 1995 Edition.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 82 13 Foundation Performance Requirements. 1995 Edition.