Remove ABC Remove Materials Remove Modeling Remove Sustainability
article thumbnail

How to Prevent Common Bottlenecks in Construction Project Workflows

Fieldwire

million more construction workers by 2023, according to a 2021 analysis by Associated Builders and Contractors (ABC). Equally important, a comprehensive and sustainable management of existing assets also needs to be in place. Potential bottleneck: Labor shortages continue to be a major issue for construction worldwide, with the U.S.

Risk 105
article thumbnail

Building With a Purpose: Exploring Construction Careers That Make a Difference

Fieldwire

Keeping costs low and sustainability high is imperative for modern architects, so some companies have turned to off-site construction. This strategy utilizes building information modeling to design structures, reducing the number of skilled workers and saving time on each project. One example is Kanner Architects, based in Los Angeles.