Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

On Call Renovation, Repair Construction – Job Order Contracting

Job Order Contracting

This document should contain all roles, responsibility, deliverables, reporting requriements, training levels, timelines, etc., This is to assure financial accountability, proper scope of work, and compliance with associated regulations/statues. The industry standard is 25 days (for JOC) with an existing design and 55 days without.”

Contract 100