article thumbnail

Specifications for design-build projects

Construction Specifier

A substantial challenge faced by professionals preparing construction specifications for design build projects is most master specifications were developed for traditional DBB or its ‘close relation,’ design-negotiate-build (DNB). DBIA documents are used in both vertical construction and horizontal (infrastructure) work.

EJCDC 52
article thumbnail

#111:  The "One Year" Warranty: Myth and Reality

NH Construction Law

of ConsensusDocs 200 – Standard Agreement and General Conditions Between Owner and Constructor. The basic one is found in Section 3.5.1, ” Almost identical language is found in Section 3.8.1 Then there is A201 Section 12.2.2.1, if, within one year after the date of Substantial Completion of the Work or designated portion thereof.