article thumbnail

Patented Precast Shaves Costs on Korean Highway | ENR.

ENR Construction

Freyssinet’s $30-million subcontract entails building the tunnel in an open trench. In that case, while being backfilled by a local contractor, a 30-m-long section of the 320-m precast arch tunnel collapsed but caused no injuries. Photo Contest Archives. Slideshows. Reader Photos. Book Reviews. Information Technology.

FAQ 51