Remove Certification Remove Commissioning Remove Design Remove Portland
article thumbnail

The Future of the Built Environment in 2019

Stok

Here, our interdisciplinary team of sustainability consultants, engineers, designers, and project managers share sound bite insights on what 2019 is shaping up to be all about. Not just in design and construction, but in operations as well. Acting on Climate Change with Resilient Design. Data Data Data. Ditch the fear.

article thumbnail

Workforce Training: Engineering A Skilled Workforce

Buisness Facilities Contributed Content

In March 2016, McAuliffe signed into law measures that establish a workforce training program targeted to increase specific industry certifications and occupational licenses that meet the needs of businesses in each region of the state. million for a veterans’ portal to strengthen outreach to this key population.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

LEED Certification, and LEED in general has been a GREAT marketing tool. 2M Design Consultants, Inc. Bork Architectural Design, Inc. BRC Acoustics & Audiovisual Design. Catherine Hall Designs, LLC. Chapman Construction / Design. Chatham County Commission. Design AVEnues LLC. 106 Greenway.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 05 Certifications Page. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 05 Certifications Page. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). Requirements.