Remove Change Orders Remove Drawings Remove Electrical Remove Subcontracting
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Projects may be architectural (finishes) , electrical, mechanical and/or plumbing in nature. The electrical may consist of, but not be limited to, demolition and construction of building electrical systems and may include service and distribution, general lighting, communications, controls and instrumentation, and other systems.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. Electrical Resistivity Investigations Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. Electrical Resistivity Investigations Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets.