Remove Change Orders Remove Drawings Remove Mobility Remove Subcontracting
article thumbnail

Snappii offers some useful construction apps to perform various construction activities efficiently

Construction Cost Estimating

Construction Blueprints and Drawings mobile app – With this app, the users can perform the following tasks :- • Instantly include project photos, notes, drawings and save on the device • generate a database of projects • draw a project initially • Talk about ideas and experience in a community forum.

article thumbnail

FAQ's About Outsourced Contractors Bookkeeping Services

Contractor Bookkeeping

A lot of contractors would like to subcontract out their bookkeeping services and the two main reasons they don''t is fear of losing control and cost. Outside Your Mobile Office: In you post office box. Have Change Orders. Need Periodic Invoices For Bank draws. They are listed in detail further down.

FAQ 49
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.