Remove Change Orders Remove Fabrication Remove Overhead Remove Software
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. 00 63 63 Change Order Form. 00 93 57 Record Change Order Requests. 00 94 33 Record Minor Changes in the Work. 01 26 39 Field Orders.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. 00 63 63 Change Order Form. 00 93 57 Record Change Order Requests. 00 94 33 Record Minor Changes in the Work. 01 26 39 Field Orders.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Equipment costs can be included in the task order only if a unit cost for equipment is listed for the specific task in the unit price book, and actually on the job. If off-site time and materials work is required, such as site fabrication, the Owner shall be so notified at the time of the issuance of the TO by the Contractor.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate knowledge and ability to maintain all HVAC Systems (clean, change and perform preventative maintenance…). Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). Demonstrate knowledge and ability to optimize HVAC controls.