#111:  The "One Year" Warranty: Myth and Reality

NH Construction Law

A common misperception among commercial contractors, particularly those who use standard form contracts, is that their warranty obligations only last for a year. Then there is A201 Section 12.2.2.1, if, within one year after the date of Substantial Completion of the Work or designated portion thereof.

article thumbnail

Specifications for design-build projects

Construction Specifier

A substantial challenge faced by professionals preparing construction specifications for design build projects is most master specifications were developed for traditional DBB or its ‘close relation,’ design-negotiate-build (DNB). There are several factors to consider when adapting DBB specifications for use on a design-build project.

EJCDC 52