Remove Commissioning Remove DC Remove Design Remove Railroad
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

Launched by the Shale Gas Innovation and Commercialization Center (SGICC), the initiative is designed to harness entrepreneurial innovation to maximize the economic return from the Marcellus and Utica shale formations. A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state.