Remove Commissioning Remove DC Remove Foundation Remove Zoning
article thumbnail

Workforce Training: Engineering A Skilled Workforce

Buisness Facilities Contributed Content

Just an hour south of Washington DC, technology, talent and quality of life is converging to create a high tech hub with a hometown feel. Culpeper’s five strategically located Tech Zones provide incentives to qualified technology zone businesses. Source: Texas Workforce Commission). CULPEPER COUNTY: HIGH-TECH HUB.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. Prepared for Headquarters, US Army Corps of Engineers Washington, DC 20314-1000. Zone HVAC systems. Update zoning of HVAC systems. Final Report.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. Prepared for Headquarters, US Army Corps of Engineers Washington, DC 20314-1000. Zone HVAC systems. Update zoning of HVAC systems. Final Report.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

The foundation work for the Highland turbines started last fall and should be done by the end of the year, with the turbines and the more than 650 blades set to go up by the end of 2015. “The A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 82 13 Foundation Performance Requirements. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning. 01 91 19 Facility Shell Commissioning. Superstructure Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 82 13 Foundation Performance Requirements. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning. 01 91 19 Facility Shell Commissioning. Superstructure Commissioning.